Los Angeles County Metro
CNG On-Call Contract
Los Angeles County
2/10 to 1/15
16 YEARS ON-CALL CNG DESIGN & TECHNICAL CONSULTING (1999-Present)
Multiple continuous on-call contracts (1999 to present) to provide design & technical consulting for CNG infrastructure across all of Metro’s 11 CNG bus fueling facilities. Includes providing specifications and conceptual design with construction supervision for all 11 facilities. A current task order includes design and construction supervision of a four-lane 4500-SCFM CNG-fueling facility at Division 13, which is 95% complete. An additional current task order is for the development of technical specifications and design drawings to relocate (3) 1650 SCFM compressor skids to a secondary CNG-equipment compound in downtown Los Angeles. Also provide incident investigation, safety inspections & reporting, testing of gas-dryer performance, and throughput-performance testing.